Personal tools
You are here: Home Meetings General Assembly 36m Meeting
Document Actions

General Assembly 36m Meeting

by Koen Van Den Abeele last modified 2007-02-13 12:13
What Meeting
When 2007-02-21 09:00 to
2007-02-23 16:30
Where Linkoping, Sweden
Contact Name Christophe Mattei
Contact Email
Contact Phone 46-13-16-91-71,
Add event to calendar vCal
iCal

 AERONEWS Topical Meetings and 7th General Assembly (36 month)

 

21-23 February 2007

 

Meeting Location:

 

Quality Hotel Ekoxen

KlosterGatan 68

SE-582 23 LINKÖPING

http://www.ekoxen.se/eng/index.asp?mainID=50

 

Meeting Location:

 

Map of Linköping


Organizer:

 

Christophe Mattei        

Bodycote Material Testing AB

Box 1340, SE-581 13 Linköping, Sweden.

Tel: 46-13-16-91-71, 46-734-18-91-71


Other Hotels:



http://gulasidorna.eniro.se/query?what=cs&search_word=hotell&geo_area=link%F6ping


TimeTable for bus connections TO/From Stokholm Skavsta:



http://www.flygbussarna.se/en/tidtabeller/skavsta_s.pdf 



Agenda

Wednesday 21/02

 

9:00am Welcome, Adoption of the agenda, Logistics

9:30am Discussion on WP1 (coffee break at 11:00am)

·  Presentations regarding progress made in the last year

·  Preparation of the upcoming Deliverables and Milestones

D3 Description and critical evaluation of the methodology and results from application of NEWS for quality control of composites, layered materials and metals and their comparison with competing methods.  UPDATE-FINAL

D4 Feasibility test of several NEWS techniques on thin extended structures, complex geometries and rotating parts.  FINAL

D5 Feedback of the observations toward the technological development of a test device inspection system.  FINAL

Milestone M2:

decision on the experimental NEWS method to be implemented in the full scale validation model

 

12:30am-2pm: Lunch

Visit of the BodyCote Material Testing AB, and SAAB Laboratories

 

Thursday 22/02

9 am Discussion on WP2 (coffee break at 10:30am)

·  Presentations regarding progress made in the last year

·  Preparation of the upcoming Deliverables and Milestones

D6 Support in terms of simulation models for the experimental optimisation study envisaged in WP1.  UPDATE

D7 A new theoretical approach and a methodology on how to locate/image defects or damaged regions using NEWS techniques in simple objects, including preliminary tests of the imaging approach to specially manufactured samples.  UPDATE

D9 A simulation based method for damage zone discrimination in parts of tested object and recognition of its limitations and influencing factors.  UPDATE

D10 Support and guidance for experimental procedures and methodology in terms of method selection, sensor and actuator placement and data acquisition (WP1, WP3, WP4).  UPDATE

Milestone M3:

simulation study of the feasibility to apply defects localization and imaging methodology based on NEWS techniques

 

12:30am-2pm: Lunch

 

2 pm Discussion on WP3 (coffee break at 3:30pm)

·  Presentations regarding progress made in the last year

·  Preparation of the upcoming Deliverables and Milestones

D11 Description, critical evaluation and adaption of available smart transducers on the market.  UPDATE-FINAL

D12 Requirement identification, adaptation and development of an advanced smart transducer package for implementation in the complete inspection system, satisfying the NEWS application demands. FINAL

D13 Design and manufacturing of smart aircraft components with integrated transducer and sensing systems, satisfying NEWS application demands. PRELIMINARY NOTES

Milestone M4:

decision and integration of the most appropriate sensor technology including smart sensor design for selected aeronautical components




Friday 23/02

9 am Discussion on WP4 and 5 (coffee break at 10:30am)

·  Presentations regarding progress made in the last year

·  Plan for the next experimental week in VZLU

·  Preparation of the upcoming Deliverables and Milestones

D15 (WP4) A test device for NEWS measurement and control-communication system supplied with appropriate software. FINAL

Milestone M5:

test device concept design and configuration based on NEWS technology

D18 (WP5) Installation of the inspection system test device in operation conditions. PREPARATION (for month 40)

12:30am-2pm: Lunch

2 pm General Assembly

·  3rd year Reporting: scientific and financial reports.

·  Other issues (3rd installment, redistribution, next meeting, dissemination)

End around 4:30pm

Navigation